Are you facing challenges in designing or buying a sign for your business due to a sign permit snag? Feeling overwhelmed by bureaucratic hurdles? Let's shed some light on sign permits!
A sign permit is a crucial document issued by the municipality where your sign will be placed. It certifies that your sign complies with all local regulations. These rules exist to ensure public safety and adherence to the city or town's desired aesthetic. Failure to comply or skipping the permit can lead to substantial fines and removal of the sign at the business owner's cost.
Let's explore the details of sign permits more thoroughly, we'll also talk about why entrusting a sign company with the permitting process is a smart decision.
Obtaining a permit from the city before installing your sign is crucial to ensure the design and specifications comply with municipality bylaws. Every city or town is different and will have varying rules to follow - some of these rules dictate the types of signs permitted, materials used, whether engineered drawings are required, or the type of illumination you can use, if your sign can be illuminated at all.
You might be thinking, "Do I really need to go through all this hassle for a simple sign?" The short answer is, yes. While navigating through the permit process can seem daunting and perhaps unnecessary, failure to follow your local regulations can have financial implications. If the proper permits are not obtained, you could face hefty fines, or even be instructed to remove your brand-new sign—all at your own expense. It's a risky gamble that could end up costing more time and money than if you had followed the proper channels in the first place.

Every city and town differs but commonly you'll need drawings showing the construction of your sign, a rendering of the proposed sign on the building, and a description of the scope. If you don't own the building your business operates from, you'll need written authorization from the landlord as well. You may also be asked to provide specific info such as the name of the installer or electrician, or even the approximate dollar value of the sign. Finally, if the sign is over a certain weight limit, then an engineering request will be often need to be completed and submitted with the permit application.
For your permit application to go as smooth as possible, it's very important to ensure you've got all your documents together before you submit your application forms. Check with your city bylaw office for a list of everything you'll need - let's recap with a quick checklist of some of the common info you may need to include in your sign application:

This is usually a pretty speedy process that won't hold up your project.
Just kidding - most applications take between 3-8 weeks. It might move faster in smaller towns, but in bigger cities like Calgary, Vancouver, or Toronto, it can stretch to 5-9 weeks.
There are a number of factors that can contribute to the delay of your sign application. Complicated designs or non-standard signs might require additional review or a variance request, causing the permit process to take longer than usual. Variance applications also typically result in additional costs.
In some cases, the necessity for public consultation or feedback, especially for signs in historic districts, may introduce delays. Being aware of these potential hurdles can help manage expectations and plan accordingly.
Absence of any of the key documents we mentioned above, like a signed letter of authorization from the landowner, detailed specifications for your signs, sign drawings, or elevation drawings may cause delays.
In cases where engineering is necessary, some municipalities may require an engineer to perform a field review and fill out a Schedule C-B post-installation to ensure compliance with engineered specifications.
Some cities or towns have very strict requirements dictating how your application should be formatted - Calgary, for example, will not allow applications to be submitted with photo overlays of the new sign on the building, and will only accept scaled architectural drawings.
Another common obstacle is municipalities with strict sign bylaws - many resort towns in BC and Alberta have prohibited many common sign types in order to maintain a desired visual look. Banff prohibits the following common signs, in addition to many less common ones:

The sign permit process can definitely be tackled with a DIY approach, but working with a sign company can make the process smoother. Experienced sign companies know the local rules well and can offer helpful advice on creating signs that comply with your municipalities codes, avoiding costly revisions. They can also handle the paperwork to ensure that all the requirements are met accurately. They also often have existing relationships with local authorities, which can speed up approvals. Working with an expert saves time, reduces errors, and is a smart choice for businesses looking to easily navigate the application process.
After a permit is approved, most municipalities require the sign to be installed within a specific time frame. This can be anywhere from 6 months to a few years.
Typically, if the sign is being replaced, and will be the same size and specs as the existing one, it will not need a permit. However, a sign permit is needed if the new sign is a different size or type, illumination is added, or you are a different tenant/business from the previous one. It is always important to check with your municipality or confirm with your signage provider. If your sign is non-conforming illegal (it was built before bylaw changes that now prohibit some detail), you may be required to conform to current bylaws before you're allowed to update your existing sign.
Proceeding without a permit can result in fines and penalties from the municipality. In extreme cases, and if the sign does not meet their bylaw criteria/code, the city may require you to take down the sign at your own expense.
We offer a permit waiver option that allows Selkirk Signs to build and install the signs while the permit application is in progress. During the permit application, if the municipality has feedback about the application (either declining the sign or requesting changes made), all incurred costs or additional costs to adjust the sign is the client’s responsibility.